2006 - 2010 Network Performance Targets

Powercor Australia has a range of performance targets for 2006-2010 for the urban, short rural and long rural lines on its electricity distribution network.

  • Annual Duration of Unplanned Interruptions (Unplanned SAIDI)
  • Annual Frequency of Unplanned Interruptions (Unplanned SAIFI)
  • Annual Duration of Planned Interruptions (Planned SAIDI)
  • Annual Frequency of Planned Interruptions (Planned SAIFI)
  • Frequency of Momentary Interruptions (MAIFI)

Targeted Levels of Reliability for 2006-10 Regulatory Period

Powercor Network Type Urban Lines Short Rural Lines Long Rural Lines
Unplanned minutes off supply per year 98 118 297
Planned minutes off supply per year 16 35 70
Unplanned interruption frequency per year 1.63 1.80 3.30
Planned interruption frequency per year 0.09 0.15 0.25
Momentary interruption frequency per year 1.5 3.1 9

 